Over the past few years, I’ve toured more water projects than I can count—municipal upgrades, hotel retrofits, off-grid farms. One product keeps popping up in specs and site photos: the smc panel tank. And not by accident. Modular GRP/SMC tanks have quietly become the go-to when corrosion, hygiene, and logistics collide.
ZJ Composites (origin: No. 9, Xingyuan South Street, Dongwaihuan Road, Zaoqiang County, Hengshui, Hebei, China) has leaned into this shift. Their Long Lasting Sanitary SMC FRP Storage Water Tank is molded on a hydraulic press from Sheet Molding Compound, then assembled with stainless fasteners, internal/external accessories, and food-grade sealant. It’s simple, but not simplistic.
| Panel size/thickness | 1×1 m modules; thickness ≈ 5–12 mm (real-world use may vary by load) |
| Material system | SMC (unsaturated polyester resin, E-glass fiber, filler, pigment/UV) |
| Mechanical properties | Tensile ≈ 60–100 MPa; Flexural ≈ 150–250 MPa; Water absorption < 0.5% |
| Temperature window | ≈ −40°C to +70°C (check gasket selection) |
| Sealing & fasteners | Food-grade EPDM/NBR gaskets; SS304/316 bolts and tie-rods |
| Hygiene | Designed to meet EN 13280 and BS 6920/WRAS; NSF/ANSI 61 on request |
| Service life | 20–30 years with routine inspection; UV-resistant gelcoat optional |
Many customers say installation time surprised them—in a good way. Panels fit lifts, stairwells, even tight service shafts. I guess that’s the charm of modular.
SE Asia hotel retrofit: 120 m³ rooftop smc panel tank, assembled in 3 days with night work to avoid guest disruption. Reported zero leakage on first fill and improved residual chlorine stability after cleaning protocol.
Desert solar farm: 200 m³ fire-water + 60 m³ domestic set. UV gelcoat and SS316 hardware selected; thermal cycling test on-site passed (≈15–52°C day swing).
| Vendor | Core material | Certs focus | Lead time | Notes |
|---|---|---|---|---|
| ZJ Composites | SMC/FRP molded panels | ISO 9001; EN 13280; BS 6920/WRAS; NSF 61 (region-dependent) | Around 2–5 weeks, sizes/options dependent | Strong hygiene focus; good flat-pack logistics |
| Regional GRP maker | GRP panels, mixed tooling | Local approvals; partial WRAS | 1–6 weeks | Competitive on small tanks; check QA consistency |
| Steel fabricator | Galvanized/SS bolted | AWWA/ISO (steel) | 3–10 weeks | Great for very large volumes; watch corrosion and weight |
Look for EN 13280 (GRP potable tanks), BS 6920/WRAS (water contact), NSF/ANSI 61 (North America), AWWA D120 (FRP tanks), and ASTM D3299/D4097 for FRP methods. Honestly, compliance varies by region; ask for test reports and recent projects.
If you’re scoping a smc panel tank for a mixed-use site—say, potable + fire reserve—spec the partitioning early and match gasket elastomer to temperature and chemistry. Small detail, big headache saver.